Modular Container Workshop for Taziker – Case Study

ModCon Cabins delivered a bespoke modular container workshop for Taziker in Birmingham.
By combining and adapting two 20ft containers, we created a 20ft x 16ft insulated, ply-lined workshop complete with steel chequer plate flooring, full electrical capabilities (240V, 110V & 3 phase), workbench, steel racking, and charging locker. Designed for on-site fabrication and repair, this fully equipped portable facility will support Taziker’s railway engineering operations for the next three years.

Client:

Taziker

Location:

Birmingham

Date:

May 2022

Sector:

Construction
case-studies-000003-scaled-1-1
seperator-002

Project Details

ModCon Cabins were asked to design and build a Modular Container workshop for Taziker.

We designed the 20ft x 16ft Workshop by utilising 2no 20ft Containers and cutting them open on the one side to form a Modular Workshop that will be utilised in Birmingham at a Railway station for the Taziker guys to utilize on site for fabricating and fixing items on site.

The Taziker engineers have a fully working workshop with 240V, 110V & 3 phase capabilities, all Insulated, Ply Lined with steel chequer plate floor. Complete with workbench, Steel Racking, Charging Locker it is a complete solution for a portable workshop set up.
This workshop will be on site for 3 years.